For afternoons spent outside.
ShadePergolaTerrace plan (0)

BEFORE THE CANOPY

A tape measure.
A clear afternoon.

Measure the uninterrupted wall width and the clear ground projection. Give the area the same name used in your plan. These measurements identify obvious size conflicts; they cannot assess the building or bracket loads.

← clear wall →projection

Your measured spaces

There are no measured conflicts in the current selection. The mounting surface and installation still require a site assessment.

Return to your terrace plan →

GARDEN PREFERENCES

Remember the space.
Or start fresh.

THE
GARDEN
LETTER

A WELCOME FOR YOUR OUTDOOR ROOM

10% off the first
terrace plan.

Choose our product and garden letter to apply10% to canopies and parts in this session.